Page Loading...Please Wait

Site Temps

Full scope of services offered from installation to removal of electrical equipment across the South East.

Southern Energy Solutions will work with you from start to finish to ensure that your site is safe.

Our team can hep no matter what the size of the site, with a wealth of experience on sites both big and small supplying electricity for the duration of the project.

Our site temps include:

  • design and specification
  • installation
  • emergency callout
  • periodic testing
  • equipment removal
No items found.
Domestic Drainage Prices
Blockage Clearance 0800hrs - 1700hrs (In hours)
£69.00 + VAT (£82.80 inc VAT) per hour OAPO
Blockage Clearance 1700hrs - 0800hrs (Out of Hours)
£92.50 + VAT (£111.00 inc VAT) per hour OAPO
Saniflo Service (where access is good)
£130.00 +VAT (£156.00 inc VAT) per unit
CCTV Survey (up to 4 hours on site inc. Wincan report)
£292.50 +VAT (£351.00 inc VAT)
Drain Tracing (CAT & Genny)
£75.00 + VAT per hour OAPO
Specialist high speed descaling (Picote or similar)
£ Quote following scoping visit
Root cutting
£ Quote following scoping visit
Commercial Drainage Prices
Blockage Clearance 0800hrs - 1700hrs (In hours)
£62.00 + VAT per hour OAPO
Blockage Clearance 1700hrs - 0800hrs (Out of Hours)
£88.000 + VAT per hour OAPO
Saniflo Service (where access is good)
£100.00 +VAT (£120.00 inc VAT) per unit
CCTV Survey (up to 4 hours on site inc. Wincan report)
£292.50 +VAT (£351.00 inc VAT)
Drain Tracing (CAT & Genny)
£75.00 + VAT per hour OAPO
Specialist high speed descaling (Picote or similar)
£ Quote following scoping visit
Root cutting
£ Quote following scoping visit
Commercial Tankering Services
3k G Tanker
£850.00 + VAT (Day rate - 8 hour shift, up to 6 hours on site) + Disposal
450 G JetVac
£950.00 + VAT (Day rate - 8 hour shift, up to 6 hours on site) + Disposal
Disposal
£60.00 + VAT per ton
Silt Disposal
£80.00 + VAT per ton
CIPP lining and CIPR patch repairs
POA