Site Temps

Southern Energy Solutions specialise in temporary site services in the South of England.

If you need to connect a temporary kitchen, bathroom or another plumbing installation or disconnection at your construction site then get in touch with Southern Energy Solutions.

Why choose Southern Energy Solutions:

  • on time and on budget
  • wide range of requirements
  • bespoke solutions

Southern Energy Solutions can assist with site wide temporary water supplies, standpipes, silos, high rise pressurised water supplies and more.

We tailor our service to you with planning meeting and site visits to ensure you get the service right for your site.

Our fully qualified, competent and experienced engineers and road tank drivers will work alongside your planning team to ensure professional plumbing installations and waste management services.

Prices
1000 gallon empty
£140 no VAT
2000 gallon empty
£200 no VAT
3000 gallon empty
£300 no VAT
Cesspit / Septic tank cleaning
£100 + vat per hour
No items found.
Domestic Drainage Prices
Blockage Clearance 0800hrs - 1700hrs (In hours)
£69.00 + VAT (£82.80 inc VAT) per hour OAPO
Blockage Clearance 1700hrs - 0800hrs (Out of Hours)
£92.50 + VAT (£111.00 inc VAT) per hour OAPO
Saniflo Service (where access is good)
£130.00 +VAT (£156.00 inc VAT) per unit
CCTV Survey (up to 4 hours on site inc. Wincan report)
£292.50 +VAT (£351.00 inc VAT)
Drain Tracing (CAT & Genny)
£75.00 + VAT per hour OAPO
Specialist high speed descaling (Picote or similar)
£ Quote following scoping visit
Root cutting
£ Quote following scoping visit
Commercial Drainage Prices
Blockage Clearance 0800hrs - 1700hrs (In hours)
£62.00 + VAT per hour OAPO
Blockage Clearance 1700hrs - 0800hrs (Out of Hours)
£88.000 + VAT per hour OAPO
Saniflo Service (where access is good)
£100.00 +VAT (£120.00 inc VAT) per unit
CCTV Survey (up to 4 hours on site inc. Wincan report)
£292.50 +VAT (£351.00 inc VAT)
Drain Tracing (CAT & Genny)
£75.00 + VAT per hour OAPO
Specialist high speed descaling (Picote or similar)
£ Quote following scoping visit
Root cutting
£ Quote following scoping visit
Commercial Tankering Services
3k G Tanker
£850.00 + VAT (Day rate - 8 hour shift, up to 6 hours on site) + Disposal
450 G JetVac
£950.00 + VAT (Day rate - 8 hour shift, up to 6 hours on site) + Disposal
Disposal
£60.00 + VAT per ton
Silt Disposal
£80.00 + VAT per ton
CIPP lining and CIPR patch repairs
POA